The Yakama Nation's Yakama Reservation Watershed Program (YRWP) is requesting bids for construction of a Salmon Habitat Enhancement Project to be implemented along Toppenish Creek, a tributary of the Yakama River, in February through December of 2026. The project will involve all work elements and specifications found in the Construction Plan Set and Project Specifications attached to this Request for Proposals webpage.
For directions to the MANDATORY pre-bid site tour on Decemeber 9th at 9:00 AM and instructions to create a bid proposal, please download the Pom Pom Road Bridge and Culvert Replacement Project RFP from this webpage.
Please note that bids will be due by 4PM, Tuesday, January 6, 2026, in hardcopy or email form.
All bids delivered hardcopy or email, must be recieved at the Toppenish office by 4PM on the RFP Closing date.
Additional Information:
- Davis Bacon Wages Apply to this contract. The winning contractor will adhere to the Davis Bacon rules and comply and submit all necessary paperwork to the Yakama Nation.
- The Yakama Nation is exempt from state taxes on this project. Please see the attached Treaty Fishery Exempt Cover Letter and Treaty Fishery Exempt Certificate. The winning contractor will receive signed copies for their records.
- This project has adopted by reference in the Engineer's Planset the 2025 Washington State Department of Transportation (WSDOT) Standard Specifications for Road, Bridge, and Municipal Construction. The 2025 Standard Specifications Maunal can be downloaded here: https://www.wsdot.wa.gov/publications/manuals/fulltext/M41-10/SS.pdf
- For additional TERO compliance questions, please reach out to Noel Hill at Noel_Hill@yakama.com, or (509) 515-6319. An example TERO agreement template is attached to this webpage.